Project Description

Mallard lodge, Flexdart – Water Orton

Client: Beaver Metals

Role: Quantity Surveying

Sector: Industrial

The project included the enabling works, demolition, site clearance, gas and electricity upgrade of a 1500m2 warehouse with adjoining office space over two floors. The scheme also involved the construction of car parking and loading areas.

Located in Water Orton, North Warwickshire between the metal extraction and industrial site of Beaver Metals. The application site has two vehicular entrance drives off Marsh Lane.

The overall scheme has incorporated the Mallard Lodge site into the adjoining industrial estate so that it becomes a fully integrated site. To achieve this, all of the buildings in the Mallard Lodge section of the application site have been demolished along with removal of the open storage. A new general industrial building (Use Class B2) has been constructed to the rear of the frontage site replacing the demolished buildings with associated integral offices.